Production Cost Report | Healthcare

Procurement Resource Thumbnail Book Image

Captopril Production Cost Breakup By Acylation Reaction

Details: Germany - based plant Q2 2024  | From $ USD

This report proffers the thorough economics of captopril production by acylation reaction. The preparation of captopril is processed by the chemical reaction between I-proline and 3-acetylthio-2-methylpropionic acid chloride. Initially, proline or I-proline is derived from glutamate using enzymes Δ1-pyrroline-5-carboxylate (P5C) synthetase (P5CS) and P5C reductase (P5CR). It is then reacted with 3-acetylthio-2-methylpropionic acid chloride (obtained from 3-acetylthio-2-methylpropionic acid). The reaction leads to the acylation of I-proline and leads to the formation of captopril as the final product.

Top Producers of Captopril

  • Accord Healthcare
  • Par Pharmaceutical
  • A-S Medication Solutions
  • Apotex
  • Baker Cummins

Feedstock for Captopril

Captopril is an angiotensin-converting enzyme inhibitor that is used as a medication. It is prepared by using I-proline and 3-acetylthio-2-methylpropionic acid chloride as its primary feedstock. The procurement of captopril is majorly dependent upon some factors, including the availability of its raw materials (such as glutamate for I-proline and 3-acetylthio-2-methylpropionic acid for 3-acetylthio-2-methylpropionic acid chloride), along with the logistics and distribution operations. Moreover, prominent aspects such as the demand observed for captopril in the pharmaceutical and medical industries, stability in the supply chain, variations in the production cost and market prices, as well as the governmental and economic policies altogether govern its procurement across various regions.

The project economic analysis provided in the report discusses a Germany-based plant:

  • Manufacturing Process
    • Process Flow
    • Material Flow
    • Material Balance
  • Raw Material and Product's Specifications
    • Raw Material Consumption
    • Product and Co-Product Generation
    • Capital Investment
  • Land and Site Cost
    • Offsites/Civil Works
    • Equipment Cost
    • Auxiliary Equipment Cost
    • Contingency
    • Engineering and Consulting Charges
    • Working Capital
  • Variable Cost
    • Raw Material
    • Utilities
  • Fixed Cost
    • Labor Requirement & Wages
    • Overhead Expenses
    • Maintenance Charges
  • Financing Costs
    • Interest on Working Capital
    • Interest on Loans
  • Depreciation Charges
  • General Sales and Admin Costs
  • Production Cost Summary
Request Sample

Report Content

Key Process Information

Evaluation of significant technical parameters along with process descriptions such as:

  • Consumption of Raw Material
  • Product Creation
  • Block Flow Diagram
  • Description of the Manufacturing Facility

Utilities Consumption

Evaluation of utilities consumed during the entire process based on:

  • Consumption per unit of product generated
  • Utility cost split and share of each utility in the total cost

Process Flow Diagram

Representation of various operations involved including:

  • Step-wise process
  • Utility consumption in each operation

Capital Cost Analysis

In-depth analysis of costs involved in setting up a new manufacturing unit, including:

  • Cost of Building a Process Unit
  • Cost of Setting Up the Infrastructure
  • Working Capital
  • Commissioning & Start-Up of the Plant

Implementation Schedule

Time frame of the project design, which includes:

  • Plant Start-Up
  • Plant Construction
  • Engineering Fundamentals
  • Raw Material Procurement

Construction Cost Details

Detailed analysis of costs involved in the operation of various functional units in the process unit and infrastructure.

Operating Cost Analysis

Evaluation of costs associated with the production of the final product, namely:

  • Procurement of Raw Materials
  • Consumption of Utilities
  • Fixed Costs
  • Depreciation

Economic Analysis

Analysis of the way in which process economics are impacted by plant capacity.

  • Construction Cost
  • Working Capital
  • Fixed and Variable Operating Costs
  • Corporate Overhead
  • Depreciation

Customized Analyses

Detailed cost estimates of any industrial plant depending on your requirements, including plant capacity and location as per the need.

Compare & Choose the Right Report Version for You

You can easily get a quote for any Procurement Resource report. Just click here and raise a request. We will get back to you within 24 hours. Alternatively, you can also drop us an email at sales@procurementresource.com.