Production Cost Report | Food and Beverages

Procurement Resource Thumbnail Book Image

Milk Chocolate Production Cost Breakup from Conching and Tempering

Details: Germany - based plant Q1 2024  | From $ USD

This report provides an extensive cost evaluation of Milk Chocolate production via conching and tempering processes. The manufacturing process of Milk Chocolate starts with cleaning, roasting, and winnowing cocoa beans to separate the nibs, followed by grinding them to obtain chocolate liquor. Cocoa butter and cocoa powder are extracted during grinding. The liquor is blended with sugar, milk, and cocoa butter to prepare a smooth paste, which is refined through conching to develop flavor and texture, with additional cocoa butter and lecithin added for smoothness and to remove the bitterness. Finally, the chocolate is tempered by controlled heating and cooling to get a glossy finish and firm structure, then poured into molds to solidify.

The project economic analysis provided in the report discusses a Germany-based plant:

  • Manufacturing Process
    • Process Flow
    • Material Flow
    • Material Balance
  • Raw Material and Product's Specifications
    • Raw Material Consumption
    • Product and Co-Product Generation
    • Capital Investment
  • Land and Site Cost
    • Offsites/Civil Works
    • Equipment Cost
    • Auxiliary Equipment Cost
    • Contingency
    • Engineering and Consulting Charges
    • Working Capital
  • Variable Cost
    • Raw Material
    • Utilities
  • Fixed Cost
    • Labor Requirement & Wages
    • Overhead Expenses
    • Maintenance Charges
  • Financing Costs
    • Interest on Working Capital
    • Interest on Loans
  • Depreciation Charges
  • General Sales and Admin Costs
  • Production Cost Summary
Request Sample

Report Content

Key Process Information

Evaluation of significant technical parameters along with process descriptions such as:

  • Consumption of Raw Material
  • Product Creation
  • Block Flow Diagram
  • Description of the Manufacturing Facility

Utilities Consumption

Evaluation of utilities consumed during the entire process based on:

  • Consumption per unit of product generated
  • Utility cost split and share of each utility in the total cost

Process Flow Diagram

Representation of various operations involved including:

  • Step-wise process
  • Utility consumption in each operation

Capital Cost Analysis

In-depth analysis of costs involved in setting up a new manufacturing unit, including:

  • Cost of Building a Process Unit
  • Cost of Setting Up the Infrastructure
  • Working Capital
  • Commissioning & Start-Up of the Plant

Implementation Schedule

Time frame of the project design, which includes:

  • Plant Start-Up
  • Plant Construction
  • Engineering Fundamentals
  • Raw Material Procurement

Construction Cost Details

Detailed analysis of costs involved in the operation of various functional units in the process unit and infrastructure.

Operating Cost Analysis

Evaluation of costs associated with the production of the final product, namely:

  • Procurement of Raw Materials
  • Consumption of Utilities
  • Fixed Costs
  • Depreciation

Economic Analysis

Analysis of the way in which process economics are impacted by plant capacity.

  • Construction Cost
  • Working Capital
  • Fixed and Variable Operating Costs
  • Corporate Overhead
  • Depreciation

Customized Analyses

Detailed cost estimates of any industrial plant depending on your requirements, including plant capacity and location as per the need.

Compare & Choose the Right Report Version for You

You can easily get a quote for any Procurement Resource report. Just click here and raise a request. We will get back to you within 24 hours. Alternatively, you can also drop us an email at sales@procurementresource.com.