Production Cost Report | Chemicals

Procurement Resource Thumbnail Book Image

Zinc Thiocyanate Production Cost Breakup From Zinc Oxide and Ammonium Thiocyanate

Details: Germany - based plant Q1 2025  | From $2499 USD

This report entails the detailed cost evaluation of zinc thiocyanate production from zinc oxide and ammonium thiocyanate. The preparation is initiated by the chemical reaction between zinc oxide and ammonium thiocyanate. The reaction can also be carried between zinc hydroxide (as an alternative to zinc oxide) and ammonium thiocyanate. The reaction further undergoes purification and results in the production of zinc thiocyanate as the final product along with ammonia as the byproduct.

Major Producers of Zinc Thiocyanate

  • Dayang Chem (Hangzhou) Co.,Ltd
  • Chemos GmbH & Co. KG
  • Leap Chem Co., Ltd

Feedstock for Zinc Thiocyanate

Zinc thiocyanate is a chemical compound prepared by using zinc oxide or zinc hydroxide along with ammonium thiocyanate as its primary feedstock. The procurement of zinc thiocyanate is majorly dependent upon some vital factors, including the availability of its raw materials (including zinc metal, ammonia, carbon disulfide, etc., further used for zinc oxide and ammonium thiocyanate production), extraction cost for zinc metal (serves as a raw material for zinc oxide), along with the variations in its market prices and production cost, etc. Additionally, other prominent factors, including the demand observed for zinc thiocyanate in chemical, pharmaceutical, and research applications, stability in its supply chain, logistics, trade, and governmental policies, along with social and economic conditions, directly influence its overall procurement worldwide.

The project economic analysis provided in the report discusses a Germany-based plant:

  • Manufacturing Process
    • Process Flow
    • Material Flow
    • Material Balance
  • Raw Material and Product's Specifications
    • Raw Material Consumption
    • Product and Co-Product Generation
    • Capital Investment
  • Land and Site Cost
    • Offsites/Civil Works
    • Equipment Cost
    • Auxiliary Equipment Cost
    • Contingency
    • Engineering and Consulting Charges
    • Working Capital
  • Variable Cost
    • Raw Material
    • Utilities
  • Fixed Cost
    • Labor Requirement & Wages
    • Overhead Expenses
    • Maintenance Charges
  • Financing Costs
    • Interest on Working Capital
    • Interest on Loans
  • Depreciation Charges
  • General Sales and Admin Costs
  • Production Cost Summary
Request Sample

Report Content

Key Process Information

Evaluation of significant technical parameters along with process descriptions such as:

  • Consumption of Raw Material
  • Product Creation
  • Block Flow Diagram
  • Description of the Manufacturing Facility

Utilities Consumption

Evaluation of utilities consumed during the entire process based on:

  • Consumption per unit of product generated
  • Utility cost split and share of each utility in the total cost

Process Flow Diagram

Representation of various operations involved including:

  • Step-wise process
  • Utility consumption in each operation

Capital Cost Analysis

In-depth analysis of costs involved in setting up a new manufacturing unit, including:

  • Cost of Building a Process Unit
  • Cost of Setting Up the Infrastructure
  • Working Capital
  • Commissioning & Start-Up of the Plant

Implementation Schedule

Time frame of the project design, which includes:

  • Plant Start-Up
  • Plant Construction
  • Engineering Fundamentals
  • Raw Material Procurement

Construction Cost Details

Detailed analysis of costs involved in the operation of various functional units in the process unit and infrastructure.

Operating Cost Analysis

Evaluation of costs associated with the production of the final product, namely:

  • Procurement of Raw Materials
  • Consumption of Utilities
  • Fixed Costs
  • Depreciation

Economic Analysis

Analysis of the way in which process economics are impacted by plant capacity.

  • Construction Cost
  • Working Capital
  • Fixed and Variable Operating Costs
  • Corporate Overhead
  • Depreciation

Customized Analyses

Detailed cost estimates of any industrial plant depending on your requirements, including plant capacity and location as per the need.

Compare & Choose the Right Report Version for You

payment-modes
$ 2499 USD

Included Content

Basic

Key Process Information

  • Raw Material and Product Specifications
  • Raw materials consumption
  • Process Flow Diagram

Capital Investment Analysis

  • Machinery Cost
  • Working capital

Conversion Cost Analysis

  • Utilities Consumption
  • Operating cost
  • Overheads
  • Financing Charges
  • GSA
  • Packaging

  • Online PDF Format
  • Updated with Q1 2025
BUY NOW
  $3499  $ 3149 USD 10% off

Included Content

Premium

Key Process Information

  • Raw Material and Product Specifications
  • Raw materials consumption
  • Process Flow Diagram

Capital Investment Analysis

  • Machinery Cost
  • Working capital

Conversion Cost Analysis

  • Utilities Consumption
  • Operating cost
  • Overheads
  • Financing Charges
  • GSA
  • Packaging

Variable Cost Breakdown

  • Raw Material Consumption with Prices
  • Utilities Consumption Breakdown
  • By-Product Credit
  • Labour charges breakdown

Investment Cost Breakdown

  • Land and Site Cost
  • Equipment Cost
  • Auxiliary Equipment Cost
  • Contingency
  • Engineering and Consulting Charges

  • Downloadable PDF Format
  • Updated with Q1 2025
BUY NOW
  $4799  $ 4079 USD 15% off

Included Content

Enterprise

Key Process Information

  • Raw Material and Product Specifications
  • Raw materials consumption
  • Process Flow Diagram

Variable Cost Breakdown

  • Raw Material Consumption with Prices
  • Utilities Consumption Breakdown
  • By-Product Credit
  • Labour charges breakdown

Investment Cost Breakdown

  • Land and Site Cost
  • Equipment Cost
  • Auxiliary Equipment Cost
  • Contingency
  • Engineering and Consulting Charges

Land and Site Cost Details

  • Land Cost
  • Development Charges

Construction Cost Details

  • Cost of Construction
  • Plant Building
  • Site Development Charges

Equipment Cost Breakdown

  • Breakdown of machinery cost by equipment
  • Auxiliary equiment cost
  • Piping
  • Electrical
  • Instrumentation

Dynamic Excel Cost Model

  • Dynamic Spreadsheet (unlocked)

  • Printable PDF Format (Optional)
  • Updated with Q1 2025
  • Technical Support
BUY NOW

You can easily get a quote for any Procurement Resource report. Just click here and raise a request. We will get back to you within 24 hours. Alternatively, you can also drop us an email at sales@procurementresource.com.